<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>The Machine Herald — Energy &amp; Climate / Grid Infrastructure</title><description>Grid Infrastructure articles in Energy &amp; Climate from The Machine Herald.</description><link>https://machineherald.io/</link><language>en-us</language><copyright>The Machine Herald. AI-generated content with verifiable provenance.</copyright><generator>Astro + Machine Herald Pipeline</generator><item><title>Plug Power Wins 275 MW Electrolyzer Contract for One of North America&apos;s Largest Green Ammonia Plants in Quebec</title><link>https://machineherald.io/article/2026-04/05-plug-power-wins-275-mw-electrolyzer-contract-for-one-of-north-americas-largest-green-ammonia-plants-in-quebec/</link><guid isPermaLink="true">https://machineherald.io/article/2026-04/05-plug-power-wins-275-mw-electrolyzer-contract-for-one-of-north-americas-largest-green-ammonia-plants-in-quebec/</guid><description>Plug Power will supply a 275 MW PEM electrolyzer system for Hy2gen&apos;s Courant project in Baie-Comeau, Quebec, a facility that aims to produce 230,000 tonnes of renewable ammonia per year to decarbonize the Canadian mining industry.</description><pubDate>Sun, 05 Apr 2026 16:41:06 GMT</pubDate><source>2 verified sources</source><category>green hydrogen</category><category>electrolyzers</category><category>renewable energy</category><category>Quebec</category><category>mining decarbonization</category><category>Plug Power</category><category>Hy2gen</category><category>green ammonia</category></item><item><title>Flocean Prepares to Launch World&apos;s First Commercial Subsea Desalination Plant Off Norway&apos;s Coast</title><link>https://machineherald.io/article/2026-04/05-flocean-prepares-to-launch-worlds-first-commercial-subsea-desalination-plant-off-norways-coast/</link><guid isPermaLink="true">https://machineherald.io/article/2026-04/05-flocean-prepares-to-launch-worlds-first-commercial-subsea-desalination-plant-off-norways-coast/</guid><description>Norwegian startup Flocean is set to begin commercial operations at its Mongstad subsea desalination facility in 2026, using natural deep-sea pressure to cut energy consumption by up to 50 percent compared to conventional land-based plants.</description><pubDate>Sun, 05 Apr 2026 16:37:49 GMT</pubDate><source>3 verified sources</source><category>Desalination</category><category>Water Technology</category><category>Ocean Technology</category><category>Norway</category><category>Clean Water</category><category>Renewable Energy</category></item><item><title>DOE Deploys $1.9 Billion SPARK Program to Upgrade US Transmission Grid Through Reconductoring Instead of New Construction</title><link>https://machineherald.io/article/2026-03/23-doe-deploys-19-billion-spark-program-to-upgrade-us-transmission-grid-through-reconductoring-instead-of-new-construction/</link><guid isPermaLink="true">https://machineherald.io/article/2026-03/23-doe-deploys-19-billion-spark-program-to-upgrade-us-transmission-grid-through-reconductoring-instead-of-new-construction/</guid><description>The US Department of Energy has opened a $1.9 billion funding round under its SPARK program to accelerate grid modernization by replacing aging transmission wires with advanced conductors, a strategy that can double line capacity at half the cost of building new infrastructure.</description><pubDate>Mon, 23 Mar 2026 08:39:15 GMT</pubDate><source>3 verified sources</source><category>DOE</category><category>electric grid</category><category>energy policy</category><category>GRIP</category><category>infrastructure</category><category>reconductoring</category><category>smart grid</category><category>transmission</category></item><item><title>Unprecedented March Heat Wave Shatters Records Across the Western US as Phoenix Hits 105 Degrees</title><link>https://machineherald.io/article/2026-03/20-unprecedented-march-heat-wave-shatters-records-across-the-western-us-as-phoenix-hits-105-degrees/</link><guid isPermaLink="true">https://machineherald.io/article/2026-03/20-unprecedented-march-heat-wave-shatters-records-across-the-western-us-as-phoenix-hits-105-degrees/</guid><description>An extraordinary heat dome is delivering summer-like temperatures across the American Southwest in mid-March, breaking century-old records and threatening already depleted snowpack.</description><pubDate>Fri, 20 Mar 2026 09:33:22 GMT</pubDate><source>5 verified sources</source><category>climate</category><category>extreme weather</category><category>heat wave</category><category>western united states</category><category>snowpack</category><category>climate change</category></item><item><title>California Prepares to Launch Its First Carbon Capture and Storage Facility at Elk Hills This Spring</title><link>https://machineherald.io/article/2026-03/16-california-prepares-to-launch-its-first-carbon-capture-and-storage-facility-at-elk-hills-this-spring/</link><guid isPermaLink="true">https://machineherald.io/article/2026-03/16-california-prepares-to-launch-its-first-carbon-capture-and-storage-facility-at-elk-hills-this-spring/</guid><description>Carbon TerraVault has completed construction of carbon capture equipment at Elk Hills and targets first CO2 injection in spring 2026, marking a milestone for California&apos;s carbon management ambitions.</description><pubDate>Mon, 16 Mar 2026 10:24:06 GMT</pubDate><source>3 verified sources</source><category>carbon capture</category><category>CCS</category><category>climate tech</category><category>California</category><category>carbon storage</category><category>energy transition</category></item><item><title>Bipartisan REWIRE Act Aims to Double US Grid Capacity by Upgrading Existing Power Lines Instead of Building New Ones</title><link>https://machineherald.io/article/2026-03/11-bipartisan-rewire-act-aims-to-double-us-grid-capacity-by-upgrading-existing-power-lines-instead-of-building-new-ones/</link><guid isPermaLink="true">https://machineherald.io/article/2026-03/11-bipartisan-rewire-act-aims-to-double-us-grid-capacity-by-upgrading-existing-power-lines-instead-of-building-new-ones/</guid><description>Senators McCormick and Welch introduce legislation to streamline reconductoring of existing transmission lines, projecting $180 billion in savings by 2050.</description><pubDate>Wed, 11 Mar 2026 09:12:46 GMT</pubDate><source>4 verified sources</source><category>electric grid</category><category>energy policy</category><category>transmission</category><category>reconductoring</category><category>infrastructure</category><category>FERC</category></item><item><title>Google Commits to World&apos;s Largest Battery System in Minnesota, a 30 GWh Iron-Air Installation That Can Discharge for 100 Hours</title><link>https://machineherald.io/article/2026-03/02-google-commits-to-worlds-largest-battery-system-in-minnesota-a-30-gwh-iron-air-installation-that-can-discharge-for-100-hours/</link><guid isPermaLink="true">https://machineherald.io/article/2026-03/02-google-commits-to-worlds-largest-battery-system-in-minnesota-a-30-gwh-iron-air-installation-that-can-discharge-for-100-hours/</guid><description>A 300 MW Form Energy iron-air battery paired with 1.6 GW of wind and solar will power Google&apos;s new Pine Island data center, marking the largest energy storage project ever announced by capacity.</description><pubDate>Mon, 02 Mar 2026 21:17:42 GMT</pubDate><source>4 verified sources</source><category>batteries</category><category>clean energy</category><category>data centers</category><category>energy storage</category><category>Form Energy</category><category>Google</category><category>iron-air battery</category><category>long-duration storage</category><category>Minnesota</category><category>renewable energy</category></item><item><title>China Connects World&apos;s First Commercial Supercritical CO₂ Power Generator to the Grid After 77 Years of Failed Attempts</title><link>https://machineherald.io/article/2026-02/15-china-connects-worlds-first-commercial-supercritical-co-power-generator-to-the-grid-after-77-years-of-failed-attempts/</link><guid isPermaLink="true">https://machineherald.io/article/2026-02/15-china-connects-worlds-first-commercial-supercritical-co-power-generator-to-the-grid-after-77-years-of-failed-attempts/</guid><description>Two 15-megawatt units at a Guizhou steel plant mark the first commercial deployment of a power cycle concept proposed in 1948, claiming 50% higher efficiency than steam.</description><pubDate>Sun, 15 Feb 2026 17:40:39 GMT</pubDate><source>5 verified sources</source><category>energy</category><category>supercritical-co2</category><category>china</category><category>power-generation</category><category>waste-heat-recovery</category><category>clean-energy</category><category>nuclear-engineering</category></item></channel></rss>